For Commercial & Industrial Hire

Temporary Systems for Projects That Need More Than Permanent Infrastructure Can Provide

Construction projects, commissioning works, temporary facilities and site expansions often require cooling, heating, refrigeration or power before permanent infrastructure is available or while project conditions are changing.

In other situations, a temporary system may be required because permanent equipment is not practical, not yet installed or only needed for a defined period.

Aircon Rentals provides temporary HVAC, refrigeration and power equipment for project-based requirements across commercial, industrial and critical environments.

Our team can support requirements ranging from a single temporary unit through to larger systems involving chillers, air conditioning, heating, refrigeration, generators and supporting equipment.

Depending on the project, we can assist with site assessment, temporary system design, equipment logistics, installation, commissioning and technical support.

Temporary systems can be deployed for short-term works or longer project periods, and adjusted where requirements change as the project progresses.

Construction & Commissioning

Construction and commissioning activities can create temporary cooling, heating or power requirements before permanent building services are operational.

Temporary systems can support occupied areas, plant rooms, commissioning activities, equipment testing and other project requirements during different stages of construction.

Equipment can be selected and configured around the site conditions and project program.

Temporary Facilities & Buildings

Temporary offices, accommodation, site facilities, events and other temporary structures may require HVAC, refrigeration or power for the period they are in use.

Aircon Rentals can provide temporary equipment together with the supporting connections and infrastructure required for the application.

This can include air conditioning, heating, refrigerated storage, generators and power distribution.

Project Delays & Permanent Equipment Lead Times

Projects do not always progress to the original schedule. Permanent HVAC, refrigeration or power equipment may be delayed in manufacturing, delivery, installation or commissioning while other parts of the project are ready to proceed.

Temporary systems can bridge this gap where cooling, heating, refrigeration or power is required before permanent infrastructure is operational.

Common situations include delays in permanent equipment delivery, equipment that has been installed but is not yet commissioned, staged construction or handover, permanent building services not being ready when completed areas need to operate, and final infrastructure works extending beyond the planned project programme.

The temporary system can remain in operation until the permanent infrastructure has been installed, commissioned and proven under normal operating conditions.

Longer-Term Temporary Systems

Some requirements extend beyond a short hire period.

Aircon Rentals can provide temporary HVAC, refrigeration and power systems for projects lasting weeks, months or longer where permanent infrastructure is unavailable, impractical or not yet required.

Longer-term arrangements can also include servicing, technical support and remote monitoring where suitable.

Product Enquiry Form