In this Chill Chat interview, Sam Shafiee sits down with Lothar Korb, the Sales Engineer for Aircon Rentals in Perth, Western Australia. They discuss how the team provided a temporary air handling unit hire solution to keep a large recreation facility running smoothly during a pool redevelopment project.

Chill Chat interview with Lothar Korb discussing a temporary air handling units hire solution for a pool redevelopment project in Perth

When a leisure centre is undergoing significant renovations, shutting down crucial air systems is simply not an option. For this project, Aircon Rentals stepped in with a high-capacity industrial air handling unit to ensure air circulation and heating for the pool area while the permanent system was being replaced.

The Challenge Requiring Temporary Air Handling Units Hire

Sam: Lothar, thanks for being here. Can you share some details about the project and the challenges the client faced?

Lothar: Absolutely. The project involved a significant redevelopment of the pool, specifically the lap pool, which was undergoing a complete overhaul. During this time, the adjacent recreation pool needed to remain open to the public. The challenge was that the existing air handling unit (AHU) serving both pools had reached the end of its life and was in the process of being replaced. Without it, the recreation pool would have lost both air circulation and heating during the winter months.

To keep everything running smoothly, we provided a temporary air handling unit rental to ensure the necessary airflow and indoor temperature were maintained.

Designing the Right Temporary Air Handling Unit Hire Solution

Sam: How did we figure out what kind of system was needed?

Lothar: Initially, the client was looking at packaged units. However, after evaluating their airflow and heating needs, we realised that those packaged systems wouldn’t be sufficient or fit well in the plant room. Instead, we recommended a 600 kW air handling unit for hire, which could deliver around 12,000 L/s of airflow.

This model struck the perfect balance between performance and compact size, allowing us to install it within the existing plant room rather than having to place it outside.

Integrating the Temporary Air Handling Unit with Existing Infrastructure

Sam: What made this solution effective for the site?

Lothar: One of the standout benefits was our ability to seamlessly integrate the temporary air handling unit with the client’s existing boiler system. This allowed us to utilise their current setup for heating, which not only saved us time but also cut down on costs.

We also crafted a custom duct connection by opening up a small section of brickwork and fitting a one-metre-diameter duct directly into the existing system. This ensured that air was distributed evenly and temperatures remained stable throughout the pool area.

Planning and Delivering the Temporary Air Handling Units Hire Solution

Sam: How long did this project take from planning to installation?

Lothar: The planning phase stretched over several months since the client’s new permanent air handling units were still being manufactured and shipped from overseas. Our job was to fill that gap.

Once we had the installation date set, we transported the temporary AHU from our Sydney depot. The delivery took two days, thanks to our logistic team, followed by one week of pre-testing at our local warehouse in Perth. After all checks were completed, our team installed and commissioned the unit in just one day.

Thanks to the precise coordination between our logistics and operations teams, we managed to complete the delivery, positioning, and commissioning efficiently and on schedule.

On-Site Challenges During the Temporary AHU Hire Project

Sam: What were the biggest challenges on-site?

Lothar: The size and weight of the unit were definitely challenges — getting it positioned safely inside the plant room required tight coordination with the builder and contractors. But with thorough pre-planning and clear communication, everything went off without a hitch.

Temporary air handling unit installed inside a plant room during a pool redevelopment project in Perth, showing ducts and pipework connected to the industrial AHU.

System Performance of the Temporary Air Handling Unit Hire Setup

Sam: How did the system perform after installation?

Lothar: It performed flawlessly. We achieved even airflow across all vents and surpassed the target air temperature of 35 °C. The system ran reliably throughout the rental period without needing any service — a true testament to the efficiency of our industrial air handling units in Perth.

Results and Client Impact

Sam: How critical was this project for the client?

Lothar: It was extremely critical. Without proper airflow and heating, the pool area would have had to shut down for the entire redevelopment period. Our temporary air handling unit rental solution in Perth kept their operations running smoothly, preventing any loss of revenue and ensuring that visitors stayed comfortable throughout the winter months.

Lessons Learned

Sam: What were the main takeaways from this project?

Lothar: Communication and planning were absolutely crucial. This project really emphasised the importance of getting everyone on the same page — the builder, HVAC contractor, and operations teams — right from the start. It also showcased how adaptable air handling unit rentals can be when it comes to filling in the gaps during system upgrades or refurbishments.

Sam: Exactly — that’s why we see ourselves as a solutions partner, not just a rental service.

Lothar: Exactly. With our extensive product range, we can choose the best option — whether it’s AHUs for rent, chillers, or packaged units — tailored to what each site needs.

Results in One Word

Sam: If you had to sum up this project in one word?

Lothar: Successful.

Why Choose Aircon Rentals for Temporary Air Handling Units Hire

Aircon Rentals provides temporary air handling units hire in Perth and across Western Australia projects where maintaining airflow and temperature control is essential. Whether it’s for pool renovations, industrial refurbishments, manufacturing facilities, or large venues, our temporary air handling units deliver the flexibility and reliability you require.

For larger-scale temperature management, our chiller hire Perth and boiler hire solutions are designed to integrate seamlessly with our AHU systems.

Need an Air Handling Unit for Hire?

 If you’re gearing up for maintenance, refurbishment, or a temporary system swap, Aircon Rentals provides fast-response air handling unit rental solutions in Perth and across the country.

Learn more: Air Handling Units Hire | Aircon Rentals

Submit Enquiry Form