For Commercial & Industrial Hire

Supporting Critical Loads When Refrigeration Capacity Is Reduced

The temporary requirement should be based on the processes, rooms and equipment that need to remain operational during a breakdown, planned maintenance or period of reduced cooling capacity.

Depending on the facility, critical loads may include processing and boning rooms, cutting and packing areas, carcass or primary chilling, chilled-water or secondary glycol circuits, air handling equipment, chilled and frozen storage, and other temperature-controlled production areas.

The temporary capacity required to maintain these loads may differ significantly from the facility’s total installed refrigeration capacity.

Aircon Rentals can assess the critical loads, existing cooling infrastructure, available connections, hydraulic requirements, electrical supply and site access before recommending a suitable temporary solution.

Temporary Chillers & Secondary Cooling Systems

These secondary circuits distribute cooling throughout the facility while keeping the primary refrigerant separate from production areas.

Where permanent refrigeration capacity is unavailable or reduced, temporary chillers may be able to support selected cooling loads through the existing secondary system.

A temporary arrangement may include air-cooled chillers, temporary or booster pumps, chilled-water or glycol hoses, adapters and fittings, plate heat exchangers, electrical distribution, temporary generators, and supporting controls and equipment.

The existing system should be assessed for required operating temperatures, fluid type and condition, flow rates, system pressure, available connection points, pump arrangements and electrical requirements.

Where glycol is used in or near food-production areas, fluid compatibility and any applicable food-grade requirements should also be confirmed. Temporary hoses, fittings and connections may need to meet the site’s hygiene and operational requirements.

Direct Connection or Plate Heat Exchanger?

Direct connection may be possible where the temporary and existing cooling systems have compatible fluid conditions, operating pressures, temperatures and hydraulic requirements.

Where separation is required, a plate heat exchanger can be used to transfer cooling between the temporary equipment and the facility’s existing secondary cooling system.

This allows the temporary circuit, including chillers, pumps and hoses, to operate separately from the existing system.

The appropriate connection arrangement depends on the facility’s existing infrastructure and the critical cooling loads being supported.

Can a Temporary Chiller Replace an Ammonia Refrigeration Plant?

A temporary chiller cannot directly replace every function of an ammonia refrigeration plant. However, where the existing ammonia system supplies a secondary chilled-water or glycol circuit, temporary chillers may be able to support selected cooling loads connected to that circuit.

This can provide temporary cooling to processing areas, air handling equipment and other critical loads while the permanent refrigeration system is unavailable or operating at reduced capacity.

The suitability of a temporary solution depends on the existing refrigeration configuration, required operating temperatures, cooling capacity and available connection points. These requirements should be assessed before temporary equipment is selected.

Temporary Cooling, Refrigeration, Hot Water and Power

Processing, Boning & Packing Area Cooling

Processing, boning, cutting and packing areas require controlled environmental conditions to support production, product quality and food safety.

During planned maintenance, equipment breakdowns or plant upgrades, temporary chillers may be connected to existing chilled-water or glycol systems to support cooling in selected production areas. Where required, temporary air handling equipment may also form part of the solution.

The appropriate cooling arrangement depends on the areas that need to remain operational, required operating conditions, internal heat loads, existing air handling infrastructure, available chilled-water or glycol connections and simultaneous cooling demand.

Environmental cooling should be assessed separately from carcass chilling, process cooling and refrigerated storage, as each application may have different temperature and capacity requirements.

Humidity & Condensation

Humidity and condensation can affect environmental conditions within meat and poultry processing facilities, particularly in areas involving frequent washdowns, temperature variations and moisture-generating processes.

Where excessive humidity or condensation creates operational or hygiene concerns, temporary dehumidification, ventilation or air handling equipment may help manage moisture levels and maintain suitable conditions.

The appropriate solution depends on the facility’s operating conditions, existing ventilation and cooling infrastructure, and specific humidity-control requirements.

Increased Throughput & Seasonal Production

Increased processing volumes, seasonal production peaks and additional production shifts can place greater demand on existing cooling and refrigeration systems.

Where permanent cooling capacity is insufficient to meet temporary production requirements, additional chillers may be used to support selected chilled-water or glycol circuits and maintain suitable operating conditions.

The required temporary capacity depends on the production processes, cooling loads, existing refrigeration infrastructure and operating conditions at the facility.

Carcass & Primary Chilling

Carcass and primary chilling are temperature-critical processes that require reliable refrigeration to maintain appropriate product temperatures and support food safety requirements.

Where these processes are supported by secondary chilled-water or glycol systems, temporary chillers may be able to provide replacement or additional cooling capacity during planned maintenance, equipment breakdowns or periods of increased production demand.

The suitability of temporary cooling depends on the existing chilling process, required operating temperatures, cooling capacity, secondary fluid conditions, flow rates and available connection points.

Some applications, including direct low-temperature refrigeration and specialised chilling systems, may require alternative temporary solutions. Aircon Rentals can assess the existing refrigeration infrastructure to determine what equipment may be suitable.

Refrigerated & Frozen Storage

Reliable refrigeration is essential for maintaining appropriate storage conditions and protecting chilled and frozen meat and poultry products.

During equipment breakdowns, planned maintenance, facility upgrades or periods of increased storage demand, temporary refrigeration equipment can provide additional or replacement storage capacity.

Depending on the facility’s requirements, Aircon Rentals can supply temporary cool rooms, refrigerated containers and supporting power solutions to maintain temperature-controlled storage.

The appropriate solution depends on the required storage temperatures, capacity, available space, site access and electrical requirements.

Hot Water for Cleaning, Washdown and Sanitation

Meat and poultry processing facilities rely on hot water for cleaning, washdown and sanitation, making reliable hot-water supply an important part of maintaining operations.

During planned maintenance, equipment breakdowns or plant upgrades, temporary boilers can provide additional or replacement hot-water capacity while permanent systems are unavailable.

Depending on the facility’s requirements, a temporary hot-water solution may include boilers, pumps, heat exchangers, hoses, temporary pipework and supporting power or fuel supply.

The appropriate system depends on the required water temperature, flow rates, existing infrastructure, available connections and site services.

Planned Refrigeration Shutdowns

Planned refrigeration maintenance, repairs and equipment upgrades can require permanent cooling systems to be temporarily taken offline, creating potential risks to production and temperature-controlled operations.

Temporary cooling solutions can be installed, connected, tested and commissioned before permanent equipment is isolated, helping facilities maintain critical cooling requirements throughout the planned shutdown.

A typical approach may involve identifying critical cooling loads, determining the required temporary capacity, assessing existing connection points and hydraulic requirements, and confirming suitable chillers, pumps, hoses and power arrangements.

Once installed, the temporary system can be tested and commissioned to confirm it is operating as required before the permanent refrigeration plant is taken offline.

Meat and Poultry Cooling, Refrigeration and Power Hire Solutions

Chiller Hire

Temporary chillers for chilled-water and glycol systems, production-area cooling, planned refrigeration maintenance and additional cooling capacity.

Chiller Options
refrigerated container hire unit for palletised cold storage industrial temporary refrigeration

Refrigeration Hire

Temporary cool rooms, refrigerated containers and commercial refrigeration equipment for additional or replacement chilled and frozen storage.

Refrigeration Options

Boiler Hire

Temporary boilers for cleaning, washdown, sanitation and process hot-water requirements during maintenance, breakdowns and equipment upgrades.

Boiler Options

Generator Hire

Temporary generators and electrical distribution to support chillers, pumps, refrigeration systems, air handling equipment and other critical electrical loads.

Generator Options

Why Choose Aircon Rentals for Meat & Poultry Processing?

24/7 support across Australia for refrigeration breakdowns, planned shutdowns, additional capacity and temporary power.

Chillers, boilers, generators, pumps, heat exchangers, air handling units and temporary power gear available nationwide.

Equipment is inspected and tested before dispatch, with pumps, hoses, heat exchangers and power accessories available as required.

We assess temperature, load, glycol or chilled-water conditions, flow, power, connections and site access before recommending equipment.

Call 1800 626 996Speak With Our Rental Team

Real-World Results: Meat & Poultry Cooling Hire

500 kW Temporary Chiller Maintains Cooling During Poultry Plant Maintenance

A poultry producer in rural Victoria required temporary cooling while its permanent chiller was isolated for scheduled maintenance.

Aircon Rentals supplied a 500 kW air-cooled chiller, chilled-water pump and temporary hoses. Due to restricted access, the chiller was craned over the building and positioned close to the existing cooling infrastructure.

The temporary system was connected, commissioned and operating before the permanent chiller was taken offline, maintaining cooling to temperature-critical areas and helping protect frozen stock throughout the maintenance period.

Read the Victorian Poultry Processing Case Study

What We Need to Assess Before Temporary Equipment is Selected

For meat and poultry processing facilities, selecting suitable temporary equipment starts with understanding the critical operational requirements, existing infrastructure and site conditions.

Critical Loads

Identify the processing and boning areas, cutting and packing rooms, carcass or primary chilling systems, chilled and frozen storage, air handling equipment, secondary cooling circuits and process hot-water requirements that need to remain operational.

Cooling-System Information

Key considerations include required operating temperatures, existing refrigeration or chiller capacity, chilled-water or glycol supply and return temperatures, fluid type and concentration, flow rates, operating pressures, pipe sizes, connection points, pump arrangements and potential plate heat exchanger requirements.

Where relevant, it is also important to identify which production areas or air handling units are served by each secondary cooling circuit.

Site & Electrical Requirements

Site considerations include available electrical supply, voltage and phase, electrical capacity, potential generator requirements, equipment positioning, hose and cable routes, lifting requirements, crane or forklift access, delivery restrictions, required start date and expected hire duration.

Where possible, these requirements should be assessed before permanent refrigeration equipment is isolated.

Prepare Before Critical Refrigeration Equipment is Unavailable

Planning ahead can help meat and poultry processing facilities reduce disruption when critical refrigeration, cooling or power equipment becomes unavailable.

Determine What Must Stay Operational

Identify the critical production areas, cooling systems and refrigerated storage requirements that need to remain operational during a breakdown or planned shutdown. This helps establish the temporary capacity required to support essential operations.

Document Secondary Cooling Circuits

Record chilled-water or glycol connection points, supply and return temperatures, flow rates, operating pressures, pipe sizes, pump arrangements and the production areas served by each circuit.

Having this information available can reduce assessment time when temporary cooling is required.

Confirm Supporting Equipment

Determine whether a temporary solution may require additional pumps, hoses, adapters, plate heat exchangers, electrical distribution, generators or air handling equipment.

Plan Equipment Access

Assess available equipment locations, delivery access, crane or forklift requirements, hose and cable routes, and any site restrictions that may affect installation.

Large temporary chillers may require specific lifting arrangements or positioning close to existing cooling infrastructure.

Explore Our HVAC, Refrigeration & Power Contingency Planning Solution

Frequently Asked Questions

What does supporting critical loads mean?

When might a meat or poultry processor need temporary cooling?

Can temporary chillers connect to existing chilled-water or glycol systems?

When would a plate heat exchanger be used?

Can a temporary chiller replace an ammonia refrigeration system?

Can temporary cooling support carcass chilling?

Can temporary cooling support a planned refrigeration shutdown?

What size temporary chiller does a meat or poultry facility need?

Do you provide temporary refrigerated storage?

Can you provide temporary hot water for washdown and sanitation?

What equipment may be required in addition to a temporary chiller?

Product Enquiry Form